Added to the top of an existing
parking structure, this 14 story building featured 13 floors of
theme oriented suites and luxuriously decorated accommodations.
Adorned with 5 different Duroplex wall systems and 13 different wall
coverings, this Hotel is full of lacquer coated fluted trim, Ralph
Loren specialty coatings and miles of unconventional painted mill
work. An elegant enclosed pool area consists of a highly detailed
and multiple colored motif capable of being adequate for the most
luxurious events. Rounding out this sophisticated facility is an
administration level complete with meeting rooms, training facility
and support facilities all decorated in functional splendor. With
all of the new construction blending with the existing structures, a
facelift on the existing was necessary. It consisted of applying a
100% acrylic masonry system to the E.I.F.S. and a high performance
Urethane system to the steel surfaces. This work was performed using
suspended stages, scaffolding and manlifts. All without interfering
with the operation of a functional facility. This project was
completed under an extremely accelerated schedule.