This facility is used for temporary
housing for National Guard Units that come to Gulfport for training
and was designed with durability as one of the primary criteria.
Constructed of Concrete Masonry Units and specifying a knock-down
Acrylic Wall System made this project unique. The masonry required
skimming the CMU's smooth prior to the application of the wall
system. The ceilings in this facility required the same system as
the wall except with a different texture. All furdowns were finished
smooth and wall covering applied. The exterior concrete of the
porches was textured and painted. The common areas of this facility
are tastefully and functionally decorated using acrylic wall systems
and vinyl wall covering.