This project consisted of sandblasting
and painting a water tank that cleans the fire fighting water
distributed to the Pascagoula Industrial Park. As a lead abatement
project, we mobilized under full expectations that the exposure
levels would exceed the 30ppm action level. After exposure
monitoring, it was determined that the exposure levels did not reach
action levels thus making our work a little easier. Once the
blasting was complete, the tank received a two coat Tnemec pota-poc
coating system.